- Warehouse Footer, April 2017
- Beginning of Warehouse, April 2017
- Beginning of Warehouse – grouting foundation walls, April 2017
- Inside Corner of Warehouse, April 2017
- Grouting Foundation Walls for Warehouse, April 2017
- Masonry Work in Progress – Beginning of Work on Warehouse, April 2017
- Warehouse, April 2017
- Warehouse, April 2017
- Warehouse – Grouting the Walls, April 2017
- Warehouse – Mason Hydraulic Scaffolding, April 2017
- Masonry Work in Progress, April 2017
- Warehouse – Mason Hydraulic Scaffolding, April 2017
- Warehouse View from Inside Looking up at Mason Work, April 2017
- Outside View of Warehouse with Trusses, April 2017
- Trusses Prefabbed on Ground, April 2017
- Different View of Warehouse with Trusses, April 2017
- Andre of Fidevia Inside Warehouse, April 2017
- New Warehouse, April 20107
- Trusses Inside New Warehouse, April 2017
- Warehouse, Inside Graded Prep for Concrete Pour, June 2017
- Warehouse Louvers, June 2017
- Warehouse, August 2017
- Painting Inside Warehouse, August 2017
- Warehouse, September 2017
- Warehouse, Record Room, October 2017
- Warehouse, Future Record Room, October 2017
- Warehouse, October 2017
- Warehouse Update, October 2017
- Warehouse Awning Area 1, October 2017
- Warehouse Awning Area, October 2017
- Warehouse Inside, October 2017
- More Warehouse Inside, October 2017
- Masonry work inside of the warehouse, November 2017
- Warehouse exterior masonry work, November 2017
- Warehouse, November 2017
- Long view of warehouse asphalt, November 2017
- Asphalt in front of warehouse, November 2017
- Warehouse roofing at entrance, November 2017
- Warehouse roofing, November 2017
- View of warehouse from school roof, November 2017
- Warehouse dock, November 2017
- Warehouse, January 2018
- Warehouse, February 2018
- Warehouse March 2018
- Dirt Moving Stage, April 2017
- Imported Shale for the Cap, April 2017
- Imported Shale for the Cap, April 2017
- Capping in Progress, June 2017
- Capping Complete, August 2017
- Capping Update, September 2017
- Topsoil Cap & Seeding, September 2017
- Erosion Blanket, September 2017
- Topsoil, November 2017
- More topsoil, November 2017
- Final Grade with Grass, October 2017
- Grass Growing Already, October 2017
- Grass on the upper flat, November 2017
- Asphalt and grass view, November 2017
- Soil Was Too Wet and We Needed to Replace with New Stone Under 1st – 3rd Wing, April 2017
- Staging Area, April 2017
- Final Grade of Parking Lot, June 2017
- Grading work, November 2017
- More Grading, November 2017
- Grading, November 2017
- Asphalt workers, hard at work, November 2017
- More asphalt workers, November 2017
- Asphalt workers, November 2017
- Another view of asphalt, November 2017
- More asphalt, November 2017
- Another view of Asphalt, November 2017
- Asphalt, November 2017
- A line of curbing, November 2017
- …Curbing, November 2017
- Another photo of curbing, November 2017
- Another view of curbing, November 2017
- More installation of curbing, November 2017
- More curbing, November 2017
- More curbing install, November 2017
- Curbing Install, November 2017
- Curbing Machine, November 2017
- More curbing, November 2017
- Another Curbing parking lot island, November 2017
- Curbing, November 2017
- Curbing parking lot island, November 2017
- Walkway to Upper Flat, October 2017
- Walking path to upper flat, November 2017
- Walking Path, October 2017
- Walking Path Continued, October 2017
- Lot Entranceway Concrete Batch Plant, October 2017
- Hauling Morter to the Masons, October 2017
- Concrete and asphalt, November 2017
- Temporary Construction Entrance, April 2017
- Geothermal Well Drilling, April 2017
- Geothermal Well Drilling, April 2017
- Geothermal Well, April 2017
- Drilling Rigs , April 2017
- Drilling Rigs, April 2017
- Trench Box for Either Sewer or Storm Water, April 2017
- Rebar in Footings, April 2017
- Rebar in the Footings of New NW Building, April 2017
- NW Foundation Wall, April 2017
- Sleeves Through the Foundation , April 2017
- NW Grading of Stone Inside Building, April 2017
- Wall Panels Waiting for Installation, April 2017
- Mortar Station,on Site, June 2017
- View if Looking out Through K5 Classroom, June 2017
- Special Education Wing Near K5 Hall , June 2017
- Autistic Classroom, September 2017
- Autistic Rm Grades 3-5, October 2017
- Autistic Special Education Room, October 2017
- Autistic Room Windows, October 2017
- Kitchen, April 2017
- Krista Visiting New Kitchen, June 2017
- Kitchen Wall, June 2017
- Looking at Kitchen, Cafe and Mechanical Room, August 2017
- Kitchen, September 2017
- Kitchen Prep Line & Serving, September 2017
- Kitchen Office, September 2017
- Kitchen Cooler Area, September 2017
- Kitchen Dock, October 2017
- Kitchen Dock, October 2017
- Kitchen Dock, November 2017
- Looking at Kitchen and Mechanical Rm. October 2017
- Kitchen and Gym, October 2017
- Kitchen dock work, November 2017
- Kitchen, January 2018
- Kitchen, January 2018
- Kitchen, January 2018
- Kitchen, February 2018
- Kitchen Office, February 2018
- Kitchen, February 2018
- Kitchen Delivery, February 2018
- Kitchen Gate, February 2018
- Kirchen 1 March 2018
- Kitchen office March 2018
- Kitchen 3 March 2018
- Mechanical Room, October 2017
- New NW Mechanical Room, April 2017
- Mechanical Room, August 2017
- Mechanical Rm, February 2018
- Mechanical Room, February 2018
- Mechanical Room ceiling March 2018
- Bill of Midline working in Mechanical Room March 2018
- Vapor Barrier Before Concrete Pour, April 2017
- View from Roof Looking at 4-5 Wing, June 2017
- View from Roof to 2-3 Wing, June 2017
- Stage, June 2017
- Stage Area, July 2017
- Cafetorium Prep for Concrete Pour, June 2017
- Cafetorium Concrete Pour, June 2017
- Cafetorium Prep for Concrete Pour, June 2017
- Cafetorium and Office Prep for Concrete Pour, June 2017
- Cafetorium Steel Work, June 2017
- Cafetorium Ramp, July 2017
- Cafetorium Steel, July 2017
- Cafetorium, Venting, July 2017
- Cafetorium Steel, August 2017
- Cafetorium, August 2017
- Cafetorium Middle and Upper Landing 1, October 2017
- Cafetorium Middle and Upper landing
- Cafetorium, February 2018
- Cafétorium, February 2018
- Stage View Looking Toward Table and Chair Storage Room, October 2017
- From Stage Looking into Cafetorium, October 2017
- Stage View Looking Toward Kitchen Serving Area, October 2017
- Stage, February 2018
- Roof Bar Joists, Will Remain Exposed, October 2017
- Cafetorium, January 2018
- Stage, January 2018
- Stage, January 2018
- Hallway Looking Toward Cafe & gym, August 2017
- Stage March 2018
- Andre, Brian, Fernando on stage discussing paint March 2018
- Group Bathrooms Cafe and Gym Area, October 2017
- Group Girls Restroom, October 2017
- Girls Lav, February 2018
- Girls Lav,, February 2018
- Boys Lav, February 2018
- Boys Lav, February 2018
- Boys Group Lav March 2018 (3)
- Chris of Palma installing first of two clear coat sealers on the group restroom floor March 2018 3
- Girls group lav March 2018
- Girls Group Lav March 2018 (2)
- Elem Classroom Bathroom, February 2018
- Tyler of Palma installing the color to the epoxy flooring in the girls group restroom. Palma is through Stuebner March 2018 2
- Tyler of Palma wearing cleets to work on floor March 2018
- Restrooms, April 2018
- Restrooms 3, April 2018
- Music and Hallway, Prep for Concrete Pour, June 2017
- Music and Hallway, Prep for Concrete Pour, June 2017
- Music Room Concrete Pour, June 2017
- Music Room, September 2017
- Music Room looking into Art Room, October 2017
- Music Rm, February 2018
- Library to the left of the work room March 2018
- A. Martin testing Strength of Parapet, June 2017
- Andre and Cat, June 2017
- Mr. Case Keeping an Eye on the Job Site, June 2017
- K4 – K 5 Entrance Way, August 2017
- K4-K5 Entrance, August 2017
- K4 Brick Work, August 2017
- K4 Classroom, October 2017
- Looking into the K4 Classroom, June 2017
- K4, K5 & Special Education RED, February 2018
- Elem Red
- K4, K5, and Special Ed – Red, February 2018
- Casework in Red wing March 2018 (8)
- Casework in Red wing March 2018 (6)
- White boards installed in Red wing March 2018
- White boards ready to install in Red wing March 2018
- Casework in Red wing March 2018 (3)
- Kindergarten Wing in Front of Bldg, October 2017
- Looking Down K4/K5 Hallway, June 2017
- Kindergarten Hallway, October 2017
- K4-K5 Hallway, January 2018
- K4, K5 Hallway, January 2018
- Red wing classroom a, April 2018
- Grades 1 – 2 – 3 Class Outside, August 2017
- Grade 1 Classroom, August 2017
- Grade 1, September 2017
- Grades 1-2 Yellow, February 2018
- Grades 1-2, Yellow, February 2018
- Grades 1-2 Yellow, February 2018
- Grade 2 Classroom, August 2017
- Grade 2 Classroom, August 2017
- 2nd Gr Classrooms, October 2017
- Grade 2 Pod, August 2017
- Grade 2 Pod, January 2018
- Grades 1-2-3 Hallway, August 2017
- Locker Area, October 2017
- 1-3 Hallway, October 2017
- 1-3 Hallway, October 2017
- Grades 1-2-3 From Outside, August 2017
- Whiteboard installed in yellow wing March 2018
- Casework inYellow wing March 2018 (5)
- Casework in Yellow wing March 2018 (3)
- Classrooms in Yellow wing are instlling whiteboards March 2018 (4)
- Casework in Yellow wing 2 March 2018 (2)
- Room 222, April 2018
- Room 222 a, April 2018
- Room 209 c, April 2018
- Room 209 b, April 2018
- Grade 3, June 2017
- Grade 3, June 2017
- Grade 3, June 2017
- Grade 3, June 2017
- Grade 3 Common Area, June 2017
- Standing at 3rd Grade Looking to Front of Building at IU Corner, April 2017
- Standing Behind the 3rd Grade Hall Looking Over the Building, April 2017
- Grades 3 & 4 from Outside, August 2017
- Grade 3 Class, August 2017
- Grade 3 @ NE Corner, September 2017
- 3-5 Gr Hallway, October 2017
- 3rd Gr Classroom, October 2017
- Grade 3 Classroom, January 2018
- 3rd GR North Hallway, October 2017
- 3rd Grade Storage Closed, October 2017
- Common Area 1-3, October 2017
- 4-5 Common Area, October 2017
- Grade 4-5 Wing, Setting Steel, June 2017
- Grade 4-5 Wing, Setting Panels as of June 2017
- Grade 4-5 Wing as of June 2017
- Grade 4-5 Hall, August 2017
- Grade 4 Class, August 2017
- Grade 4-5 Common Area, August 2017
- Grade 4-5 Hallway, September 2017
- Grade 4, September 2017
- 4th Gr Class, October 2017
- 4th Gr Classroom, October 2017
- Grade 5 Class, August 2017
- Grade 5, September 2017
- 5th Gr Classroom, October 2017
- 5th Gr Classroom, October 2017
- Grades 3-5 Green, February 2018
- Grades 3-5 – Green, February 2018
- Grades 3, 4, 5 – Green, February 2018
- Classrooms in Green wing instlling whiteboards March 2018
- Classrooms in Green wing are instlling whiteboards March 2018 (2)
- Green wing classroom March 2018
- Whiteboard installed in Green Wing March 2018
- Room 192, April 2018
- Room 192 a, Apirl 2018
- Room 178 b, April 2018
- Room 172 a, April 2018
- Room 172 c, April 2018
- Room 165, April 2018
- Room 165 a, April 2018
- Room 165 b, April 2018
- Itinerant Learning Near 5th, August 2017
- Itinerant Learning, October 2017
- Supplemental Near 5th, August 2017
- Supplemental Learning, October 2017
- Speech & Sensory Room, October 2017
- IU Classroom, October 2017
- IU Classroom Another View, October 2017
- IU Classroom, January 2018
- Headstart Classroom, October 2017
- Life Science Room, August 2017
- Life Science Room, September 2017
- Life Science Lab, October 2017
- Tech/Science room, August 2017
- Tech Science Rm, October 2017
- Technology Lab, October 2017
- Technology/Science Room, September 2017
- Computer Lab, February 2018
- ESOL Room, August 2017
- ESOL, August 2017
- ESOL Classroom, October 2017
- ESOL Classroom, January 2018
- Art Rm, February 2018
- Doorway w/Mason Scaffolding, August 2017
- Administrative Area, July 2017
- Administrative Area and Ramp…Pouring Gym, July 2017
- Administrative Area, August 2017
- Admin Area, September 2017
- Office, February 2018
- Office Work Space, April 2018
- Front of Building, October 2017
- Front of Building, October 2017
- Main Office Area, October 2017
- Front Office Entry, January 2018
- Outside of Bldg Entry, February 2018
- Front of Building, September 2017
- Hallway Looking Towards Office, August 2017
- Crew Motrering in Block Pockets in Cafetorium, October 2017
- Skeleton of Inside Building, July 2017
- Gym is Poured, July 2017
- Gym & Cafetorium Ramp, Outside View, July 2017
- Gym, August 2017
- Gym & Cafetorium View from Old Forge Road, August 2017
- Gymnasium, September 2017
- ADA Ramp to Stage, October 2017
- Gym, October 2017
- Gym, October 2017
- Gym, October 2017
- Gym, January 2018
- Gym, February 2018
- Gym, February 2018
- Gym, February 2018 – Blue
- Workers Laying Brick on Top of Gym, October 2017
- Masonry Working with Roofers Above, October 2017
- Gym March 2018
- Gym March 2018 (2)
- Library Concrete Prep, October 2017
- Library & Technology Room Concrete work, November 2017
- Advancing with Library and Tech room concrete work, November 2017
- Library and Tech room another view of concrete, November 2017
- Library and Tech room concrete work, November 2017
- Library roof, November 2017
- Library/Tech steel, November 2017
- More Library/Tech steel, November 2017
- Library, February 2018
- Library and work room March 2018 1
- Scott Wolfe Scott Shive and Jeff aka tinker bell pulling light circuits in Library March 2018
- Library and work room March 2018
- Library, April 2018
- Library Nook, April 2018
- Tech lab March 2018
- Jesus of Pagoda pulling fire alarm wire throughout building March 2018 5
- Basketball and Playground Area, October 2017
- Custodial Closet & Mechanical Room, August 2017
- Custodial Closet, October 2017
- Art Room, September 2017
- Nurses Suite, October 2017
- Nurse & School Counseling Suites, October 2017
- Common Area storing sinks March 2018
- Looking into Courtyard, June 2017
- Courtyard, July 2017
- Courtyard Brick Work, August 2017
- Courtard, August 2017
- Storage Shed in Courtyard, August 2017
- Courtyard, August 2017
- Pond, August 2017
- Pond, August 2017
- Pond, August 2017
- Pond, September 2017
- Pond Stamped Concrete, September 2017
- Pond Seating, September 2017
- Pond Seating Close-up, September 2017
- Pond, September 2017
- Courtyard, October 2017
- Pond, Plants, October 2017
- Pond Educational Seating, October 2017
- Pond Stamped Concrete, October 2017
- Pond view, November 2017
- Another view of the courtyard, November 2017
- Courtyard, November 2017
- View of courtyard, November 2017
- Courtyard, January 2018
- Courtyard March 2018
- pond 1, April 2018
- Faculty Room, October 2017
- Playground Exit, October 2017
- Playground and Basketball Area, October 217
- Playground March 2018
- Met Ed, October 2017
- Met Ed Installing Main Lines from Lehman St, October 2017
- MetEd Service wires, November 2017
- Building Exterior Colors, October 2017
- Brick Asthestics with Expansion Joint, October 2017
- Eyebrows, October 2017
- Windows, October 2017
- Outside, January 2018
- Outside, January 2018
- NW Outside, February 2018
- Windows, November 2017
- Building Name Installed March 2018
- More windows, November 2017
- Windows everywhere, November 2017
- Hallways worth of windows, November 2017
- Windows above doorways, November 2017
- Electric and Piping, November 2017
- North Side roofing, November 2017
- Midline setting a rooftop unit, November 2017
- More of Midline setting a rooftop unit, November 2017
- School Storage, February 2018
- Recycling at Construction Site, February 2018
- Stilted Painter, February 2018
- Fresh Air Vent, February 2018
- Bus Loop (looking left), January 2018
- Bus Loop (looking right), January 2018
- Water fountain installed March 2018
- Thermostat with cover March 2018
- Russ of Conexus wiring and programming all of our units 2 March 2018
- Justin of Klover installing wall angle in the faculty room March 2018
- Justin of Klover installing wall angle in the faculty room March 2018 6
- Joe Trego moving casework March 2018 (3)
- Andre of Fidevia and Fernando of Wenrich Painters March 2018
- panoramic, April 2018
- Yellow Wing Locker and Hallway View, May 2018 (Small)
- Warehouse, May 2018
- Stage Risers, May 2018
- Sod, May 2018
- Security Office & Front Office Door, May 2018
- Science Lab looking into courtyard, May 2018
- Science Lab, May 2018
- Science Lab Door, May 2018
- Science Lab Door 1, May 2018
- Red wing lockers
- Red Wing – Red Lockers
- Pond, May 2018
- Pond, May 2018
- Pond, May 2018
- Pond, May 2018
- Office Work Area, May 2018
- Office looking thru mailroom, May 2018
- Office Back Wall, May 2018
- NW Sidewalks, May 2018
- Music Rm Ceiling, May 2018
- Mrs. Stouch’s Gr 3 Rm Wall 4, May 2018
- Mrs. Stouch’s Gr 3 Rm Wall 2, May 2018
- Mrs. Rutt’s IU13 Room, May 2018
- Mrs. Ramirez’s Gr 5 Teaching Wall, May 2018
- Mrs. Murry’s K4 Rm 1, May 2018
- Mrs. Miller’s K5 Rm Wall 1, May 2018
- Mrs. Mann’s Music Room, May 2018 (
- Mrs. Miller’s K5 Rm Wall 2, May 2018
- Mrs. Mann’s Music Rm 1, May 2018
- Mrs. Gahres’s Art Rm, May 2018
- Mrs. Gahres’s Art Rm 2, May 2018
- Mrs. Gahres’s Art Rm 1, May 2018
- Mrs. Burgess SGI, May 2018
- Mrs. Brightbill LS Rm, May 2018
- Mrs. Beard’s Gr 1 Rm Wall 3, May 2018
- Mrs. Beard’s Gr 1 Rm Wall 2, May 2018
- Medical Restroom, May 2018
- Medical Shower, May 2018
- Medical Storage, May 2018
- Library, May 2018
- Library Work Rm, May 2018
- Library Nook, May 2018
- Library Hall towards Kind
- Library After Newsletter, April 2018
- Kitchen Tray Room, May 2018
- Kitchen, May 2018
- Kitchen Ramp, May 2018
- Kitchen Cook Pots, May 2018
- Kitchen 3, May 2018
- Kitchen 2, May 2018
- K thru Spec Ed Block Lockers
- K Wing Common Area, May 2018
- IU13 2, May 2018
- Gym Floor Install
- Gym Floor Install
- Gym Floor Install
- Head Start Rm, May 2018
- Gym Floor Install
- Head Start Rm 2, May 2018
- Gym, April 2018
- Gym Floor ready to sand, May 2018
- Gym Floor ready to sand 1, May 2018
- Gym 1, April 2018
- Green Wing Lockers 1, May 2018
- Green Wing Girls Restrooms, May 2018
- Green Wing Girls Restrooms 1, May 2018
- Green Wing Boys Restrooms, May 2018
- Floor Coloring
- Green Wing Boys Restrooms 1, May 2018
- Floor Color Chart, May 2018
- Entrance, May 2018
- Cafetorium, May 2018
- Admin Restroom, May 2018
- All Access Stage Entry, May 2018
- Building Side View from Lot, May 2018
of Google translations.